The Gully drain is not fixed and blocked solid with mud
Reported in the Road and Pavement Issues category anonymously at 09:16, Sun 3 November 2019
Sent to Bromley Council 4 minutes later. FixMyStreet ref: 1829409.
The Gully drain between the foot path and my driveway is not fixed and blocked solid with mud along the entire length. The gully needs to be cleared along the length and the drain covers fitted back or replaced/repaired where required. The overflowing water has caused damage (potholes) to my driveway, although the weather has been extreme, so I would really appreciate making sure the council owned drain gully is properly cleared and fixed. Thanks in advance
Updates
-
Thank you for your report, this is now being investigated. Information on our services and the timeframes we aim to respond in can be found: http://www.bromley.gov.uk/ fixservices
State changed to: In progress
Posted by Bromley Council at 09:22, Mon 4 November 2019
-
Our contractor has been notified to take the appropriate action.
Posted by Bromley Council at 11:02, Fri 22 November 2019
-
Appropriate action has been taken to resolve the issue.
State changed to: Fixed
Posted by Bromley Council at 10:07, Tue 3 December 2019
-
Nothing has been done. The repairs are still required
Posted anonymously at 10:35, Tue 3 December 2019
-
Checked today drain has not been repaired see photo
Posted anonymously at 10:36, Tue 3 December 2019
-
Thank you for your report, this is now being investigated. Information on our services and the timeframes we aim to respond in can be found: http://www.bromley.gov.uk/ fixservices
State changed to: In progress
Posted by Bromley Council at 11:31, Fri 20 December 2019
-
We are continuing to investigate and working to resolve this report
Posted by Bromley Council at 14:02, Mon 23 December 2019
-
This repair was reported 3 November 2019 and is still outstanding. Please could Bromley Council provide an update?
Posted anonymously at 06:17, Wed 29 January 2020
-
Our contractor has been notified to take the appropriate action.
Posted by Bromley Council at 13:17, Wed 29 January 2020
-
Appropriate action has been taken to resolve the issue.
State changed to: Fixed
Posted by Bromley Council at 13:12, Tue 10 March 2020
-
After being unblocked by The Council the gully drain has broken up and collapsed in, see photos. It is currently a trip hazard. The existing drain covers are a mix of plastic and metal. The gully needs to be cleared from obstructions and a replacement metal gully drain is required to prevent trip or fall
Posted anonymously at 11:07, Sun 19 April 2020
-
Thank you for your report, this is now being investigated. Information on our services and the timeframes we aim to respond in can be found: http://www.bromley.gov.uk/ fixservices
State changed to: In progress
Posted by Bromley Council at 13:20, Tue 28 April 2020
-
Our contractor has been notified to take the appropriate action.
Posted by Bromley Council at 13:07, Wed 29 April 2020
-
Our contractor has been notified to take the appropriate action.
Posted by Bromley Council at 20:53, Sun 26 July 2020
-
The contractor has replaced half of the gully drain covers thank you. However the remaining plastic gully has Collapsed. Can I suggest this is replaced with a heavy duty metal gully cover to cope with the commercial traffic passing over the drain
Posted anonymously at 05:16, Wed 29 July 2020
-
Appropriate action has been taken to resolve the issue.
State changed to: Fixed
Posted by Bromley Council at 11:26, Mon 3 August 2020
-
The drain takes commercial traffic and using bits and bobs to repair it doesn’t work. Within 3 days it’s collapsed again. The botched repairs are not sufficient for purpose. A proper repair with full length heavy duty metal drain covers along the full length of the drain gully are required. It has been botched 3 times now. I’m concerned how much the contractor is charging the council for the previous botch jobs. Can they be refunded to LBB and the job done properly please?
Posted anonymously at 10:32, Wed 5 August 2020
-
Thank you for your report, this is now being investigated. Information on our services and the timeframes we aim to respond in can be found: http://www.bromley.gov.uk/ fixservices
State changed to: In progress
Posted by Bromley Council at 12:31, Tue 18 August 2020
-
Our contractor has been notified to take the appropriate action.
Posted by Bromley Council at 14:27, Wed 2 September 2020
-
The issue has been re-attended and additional works completed. If the issue re-occurs please re-report via: https://fix.bromley.gov.uk
State changed to: Fixed
Posted by Bromley Council at 15:01, Thu 15 April 2021
-
This drain has not been repaired see photo taken today. It remains a trip/fall hazard. As per my last update 5 August 2020 some 8 months ago the drain is NOT fixed. The drain takes commercial traffic and using bits and bobs to repair it doesn’t work. Within 3 days it’s collapsed again. The botched repairs are not sufficient for purpose. A proper repair with full length heavy duty metal drain covers along the full length of the drain gully are required. It has been botched 3 times now. I’m concerned how much the contractor is charging the council for the previous botch jobs. Can they be refunded to LBB and the job done properly please?
Posted anonymously at 08:23, Sun 18 April 2021
-
Appropriate action has been taken to resolve the issue.
Posted by Bromley Council at 15:38, Tue 20 April 2021
-
Thank you for the update, please advise what action has been taken to resolve the broken gulley drain?
Posted anonymously at 17:53, Tue 20 April 2021
-
As per the photo, works have now been completed.
Posted by Bromley Council at 21:31, Tue 20 April 2021
This report is now closed to updates from the public. You can make a new report in the same location.