Closed
Tue 27 Sep: 'Pedestrians crossing' signs for LBB Circular Walks (1 of 3)
Reported via desktop in the Sign Missing/Damaged category by Friends of Green Street Green Common at 11:28, Tue 27 September 2022
Sent to Bromley Council less than a minute later. FixMyStreet ref: 3851735.
LBB Chelsfield and Green Street Green Circular Walks (https://www.bromley.gov.uk/ downloads/ download/ 343/ circular-walks) FP259 crosses Warren Road. Motorists approaching the crossing point from the A224 Court Road at/over the 40mph speed limit cannot see pedestrians/walkers emerging from Chelsfield Green due to kink in road. Please install 'Pedestrians crossing' signs to warn motorists travelling in both directions (as per example from A21 Farnborough Hill). TIA
Asset ID: FP259
Updates
-
Thank you for your report, this is now being investigated. Information on our services and the timeframes we aim to respond in can be found: http://www.bromley.gov.uk/ fixservices
State changed to: In progress
Posted by Bromley Council at 11:28, Tue 27 September 2022
-
Thank you for your report, this is now being investigated. Information on our services and the timeframes we aim to respond in can be found: http://www.bromley.gov.uk/ fixservices
Posted by Bromley Council at 08:58, Wed 28 September 2022
-
Our Traffic Team are continuing to investigate this reported concern.
Posted by Bromley Council at 09:29, Fri 30 September 2022
-
Local ward councillors have announced that resurfacing works on Warren Road between A224 Court Road and The Highway have started today. Please include the above request in the works, acknowledging the Safe Roads for All report - https://www.saferoadsforall.org - “Investment in road infrastructure should be proactive. This means we invest to prevent harm and enable active travel, rather than waiting until someone has already been killed or hurt.” TIA
Posted by Friends of Green Street Green Common at 17:45, Thu 6 October 2022
-
This report has been investigated via a site visit by a traffic engineer, and any recommended actions will be taken as required.
State changed to: Closed
Posted by Bromley Council at 15:33, Thu 10 November 2022
-
Thank you for your report. This has been passed to the traffic engineering department for investigation and action if required.
State changed to: No further action
Posted by Bromley Council at 15:35, Thu 10 November 2022
This report is now closed to updates from the public. You can make a new report in the same location.